Preferred Materials, Inc. requests quotes from approved State Disadvantage Business Enterprises (DBE) or other subcontractors Erosion Control, Clearing & Grubbing, Optional base, Concrete Removal, Concrete Curb & Sidewalk, Drainage, Detectable Warnings, Full Depth Reclamation, Grassing/Sod, Maintenance of Traffic, Milling, Milling Cleanup, Signage, Pavement Markings/Striping, QC/Testing, Signalization, Trucking/Hauling for #IFB-26-00184 Roadway Resurfacing & Repair Surtax Project (WORCS 2) Hillsborough Cty. Efforts to assist interested DBE’s in obtaining bonding, lines of credit, or insurance will be provided if needed. For your convenience, plans and specifications can be downloaded from our Preferred Materials FTP site or viewed at our office. The contractor assumes full responsibility for review of all current contract documents, to include any addenda that may be issued with his/her submission of a quote.
The Estimator for this project is: Jon Stebick @ jon.stebick@preferredmaterials.com and all quotes and questions should be sent to him.
Bids are due 5/11/2026 prior to noon, via email: jon.stebick@preferredmaterials.com
04/29/2026 86267
